Mark Thomas provided surveying and mapping services for the Freeport Regional Water Project, consisting of a new intake structure and pumping plant located on the Sacramento River, a 17-mile long discharge pipeline (84-inch and 66-inch-diameter), and a new, mile-long, 66-inch-diameter pipeline. We completed aerial control surveys, topographic surveys, utility surveys, and right of way retracement surveys. Our surveyors provided appraisal mapping and legal descriptions for acquisitions along the project corridor.