Marsh Creek Road Bridge Replacement
Design services for Marsh Creek Road Bridge replacement, improving approach alignment and meeting current guidelines.
Details
Description
Mark Thomas prepared the final design for the Marsh Creek Road Bridge replacement, designing a single-span precast concrete box girder bridge with approach roadways and a retaining wall to protect a steep hillside. The new alignment avoids detours and meets updated water surface elevations, featuring two 12-foot travel lanes and 8-foot shoulders. Coordination with PG&E and Contra Costa Water District was required for utility relocations. The project won multiple awards.
Market Sector
Awards
- 2019 ENR California Best Project, Highway/Bridge Category
- 2019 APWA National Transportation Project of the Year <$5M
- 2019 APWA Northern California Chapter Transportation Project of the Year <$5M