Mark Thomas to Provide Inspection Services for Eastside Road Bridge Replacement in Redding
Mark Thomas is proud to support the Eastside Road Bridge Replacement in Redding, improving travel lanes, sidewalks, and utilities. Our inspection services will help ensure safety, quality, and connectivity for the community.
We’re pleased to announce that we’ve been selected to provide inspection services for the Eastside Road Bridge Over Olney Creek Project in the City of Redding! The proposed bridge replacement for Eastside Road will provide two 12-foot travel lanes with 8-foot shoulders and a 7-foot wide sidewalk and barrier on each side. The bridge will be 54-feet wide and includes road approaches, minor concrete work, fencing, removal of 12-inch asbestos concrete pipe, gas main relocation coordination, and over 400-feet of 12-inch ductile iron waterline and valves. The new sidewalk on the east side of the road would connect to an existing sidewalk in the southeastern corner of the project area, closing the existing gap and increasing pedestrian safety.